Buchs WTE plant – combustion line 2: installation of a flat slide valve & connecting piece

12.01.2023

A 9.0-m long flat slide valve including a new connecting piece were installed in the discharger area during this year's short inspection of combustion line 2.

The work was completed on schedule and to the entire satisfaction of the client.

Image

Image

Image